*S&S Music*
S&S Music
visits
The S&S Music Production Setup Time line
|
Several runs of covering is applied to the floor The stages arrive
Gear starts coming in off the truck The truss is carried in and set in place
The truss is assembled and lights are hung The Cobra system is stacked and wired
Meanwhile, power is connected to the amps All the power is supplied by a 60K watt
diesel generator
The back truss along with the drape and Both up and down stage trusses are
squares are raised in the air and awaiting the focus