Installations 2
S&S Music
First Baptist Pine Bluff
This is a new construction. We
were approached by this church
to design a system for their new
family life center. The challenge
was to install a system that
would work in a highly reflective
room. Additionally we were
asked to design two identical
systems for smaller rooms
outside of the big room pictured
below. The contractor, Robert
Shepherd has been great to
work with. He has been very
helpful and friendly throughout
the entire job. A few things were
not done to our specs but we've
been able to work around it.
Front of House Position Amp Room
Beatle is taking a break from pulling wire The snake had to be
peeled for it to fit
The EV Amp rack with Furman Power Sequencer We pulled wire through the crawl spaces
where it was around 130 degrees!